SWBNO Fills Gentilly Hole Months After Complaint, Following Media Inquiry
Vennie Britton waited from March to November for a repair on Wisteria Street, a delay he attributes to a lack of response until a local news station intervened.
By Ibrahim Howard ·

The Sewerage and Water Board of New Orleans filled a pothole on Wisteria Street in Gentilly this month after local news coverage prompted a review of the repair timeline. The utility placed gravel in the spot where the asphalt had failed, marking the end of a months-long wait for the resident who reported the issue.
Vennie Britton, who lives adjacent to the damaged section, described the hole as a hazard for traffic. He reported that vehicles frequently struck the depression, and the local station measured the gap to be one and a half feet deep. Britton placed an orange cone in the center of the hole and draped it with Mardi Gras beads to make the danger visible to drivers.
Records from New Orleans 311 show a complaint regarding the hole was assigned to the utility in March 2026. By September of that year, the SWBNO dashboard listed a work order to address the problem. However, the physical repair did not occur until after a news station emailed the utility about the specific location in October.
SWBNO executive director Randy Hayman told the City Council in November that his team is evaluating a new work order system. He stated the update will allow staff to view past history immediately on their screens, aiming to make the process more automatic. The utility’s written statement notes that the average timeline for paving is 42 days, which places the final restoration for Wisteria Street at the end of December.
City Councilmember Aimee McCarron raised concerns about the utility’s communication with residents during a council meeting earlier in the month. She described the situation as increasingly frustrating, noting that constituents are contacting her directly due to slow responses from the board. She has previously urged SWBNO to improve its internal workflows.
SWBNO has identified General Superintendent Kaitlin Tymrak as the official to speak about the incident next month. The utility stated that customers can track open water, sewer, and paving projects through their online dashboard, which includes estimated repair timelines for specific neighborhoods.






